Construction of a 120’ long, 3 span aluminum bridge, including cast-in-place concrete piers and cantilevered end span to pool deck.
Architect: Mariani Landscape
Location: Wilmette, IL
Engineer: AECOM
Service: Specialties
“Our objective was to join the main house to the lake house. StruxC-MC worked closely with the architect, engineer, and the bridge manufacturer to bring our plan into reality. They made a difficult task easy.”